Drainage & Groundworks

Recent Projects Include:

The installation of a pumped system installed to raise effluent from a low level Railway Station and Hotel complex into a main sewer at 20 metre higher elevation. These works involved the building of a 4 metre deep pumping station together with the installation of associated civil works and mechanical equipment e.g. pumps, petrol interceptor, etc.

The installation of a pumped drainage system involving formation of a 4 metre deep pumping station and all associated civil works to lay a drain approx. 250 metres to a main sewer complex.

Both the above projects involved detailed planning to handle the critical interface with road traffic and travelling public to ensure Health & Safety requirements were not compromised.

Drainage renewal has been carried out for Wates Construction on 300 properties for Manchester City Council.

GBJ, Unit 4, Gatewarth Industrial Estate, Barnard Street, Warrington, Cheshire. WA5 1DD.
Telephone: 01925 635568 Mobile: 07801 032831 Fax: 01925 242667
Web Design by www.scene2.net