![]() |
![]() |
![]() |
|||||||||
![]() |
|||||||||||
| Drainage & Groundworks
Recent Projects Include: The installation of a pumped system installed to raise effluent from a low level Railway Station and Hotel complex into a main sewer at 20 metre higher elevation. These works involved the building of a 4 metre deep pumping station together with the installation of associated civil works and mechanical equipment e.g. pumps, petrol interceptor, etc. The installation of a pumped drainage system involving formation of a 4 metre deep pumping station and all associated civil works to lay a drain approx. 250 metres to a main sewer complex. Both the above projects involved detailed planning to handle the critical interface with road traffic and travelling public to ensure Health & Safety requirements were not compromised. Drainage renewal has been carried out for Wates Construction on 300 properties for Manchester City Council. |
|||||||||||
![]() |
|||||||||||
![]() |
|||||||||||
|
GBJ, Unit 4, Gatewarth Industrial Estate, Barnard Street, Warrington, Cheshire. WA5 1DD.
Telephone: 01925 635568 Mobile: 07801 032831 Fax: 01925 242667 |
|||||||||||
|
Web Design by www.scene2.net
|
|||||||||||